Rickmansworth Playing Fields Case Study

About the Project

We created a MUGA playing surface at Rickmansworth playing fields. The project began with a site visit where we assessed the suitability of the site and talked through the potential options available with the client. From here it was decided that the current tennis surface would be replaced with a brand new macadam MUGA surface.

The next step was to pierce the surface and then remove the old tennis sockets. We then carried out the preparation work at the perimeter of the courts before installing new kerbing, including concrete ring beam. To accommodate the new height of the court changes also needed to be made to the gate. Now that the foundation work was complete, we added a wearing level of macadam and then the surface level before colour spraying for an excellent finish.